Complete Projects

These projects stand as proof of what we do best: turning vision into lasting value and delivering on every promise we make. Each completed project reflects our commitment to quality, innovation, and investor satisfaction.

Located off Naivasha Road in Riruta, TG Kawa is a smart, mixed-use studio apartment development designed for modern urban living and strong rental returns. Developed by True Group and backed by the engineering expertise of Burhani Engineers Ltd, TG Kawa blends clean architectural design, functional layouts, and a management model built for consistency.

Welcome to House 205, a beautifully renovated and stylish 4-bedroom home located in the peaceful Mukenya Court, Buruburu Phase 1.

Originally a 3-bedroom maisonette, this property has been professionally upgraded into a modern, spacious 4-bedroom residence, offering contemporary finishes and functional design for family living.

The Point Mall

The Point Mall is BuruBuru’s flagship urban center –
blending high-footfall retail, essential services, and lifestyle brands in a location built for community connection and long-term value. With a mix of anchor tenants, boutique shops, eateries, clinics, and flexible office spaces, it offers a diversified commercial ecosystem in one of Eastlands’ busiest corridors.

Beza Student Residence

Beza Student Residences is a purpose-built student housing development in Lusaka, Zambia, offering 92 fully self-contained units tailored for the growing academic market. Strategically located and professionally managed, it’s designed to maintain strong occupancy and deliver consistent, hassle-free income over time.

Palm Hub

Palm Hub is a well-positioned mixed-use development in Bamburi, Mombasa – blending commercial frontage with a multi-unit residential component to create a vibrant, self-contained address. With steady footfall, built-in demand, and a flexible urban layout.